DMR has prepared one proposed amendment to38CSR2 for the 2018 Legislative Session that consolidates all the blasting requirements under 38CSR2 by modifying §38-2-6 (Blasting) and create new sections 38-2-25 thru 27 (Certification of Blasters; Blasting Damage Claim and Arbitration for Blasting Damage Claims and Explosive Material Fee, respectively). It also modifies the notification requirements for preblast surveys to be consistent with change made in §22-3-13a. Preblast survey requirements by SB 687 (2017 Regular Legislative Session). Once the requirements have been consolidated, 199CSR1, Surface Blasting Rule, can be rescinded
Surface Blasting Rule
Details
Type: Legislative RuleAgency: Mining And Reclamation
CSR Number: 199-01
Effective Date: July 1, 2017
Summary
Submitter Details
Name: charles stureyEmail: charles.s.sturey@wv.gov
Phone: 304-926-0499 ex 1526